University of Georgia Driftmier Engineering Center Renovations (Ph I, II, III & 2-Story)
Phased mechanical, plumbing and fire protection systems renovation of a 110,000 square foot, 1960s-era classroom, laboratory, and office space building.
Phased mechanical, plumbing and fire protection systems renovation of a 110,000 square foot, 1960s-era classroom, laboratory, and office space building.
Mechanical renovations for a five-story, approximately 23,950 square foot wet-lab research laboratory originally built in 1987. Photos courtesy of JandDimages.
Mechanical renovation of an existing 33,000 square foot, three-story fire arts building, including removal of all existing steam infrastructure.
Renovation of approximately 16,500 sq. ft. of existing Student Center, consisting of mechanical system improvements, infill of existing pool, and
Total renovation of an 8,000 sq. ft., two-story, stucco-clad masonry building, originally constructed in 1874, including the full replacement of
Complete mechanical design services for the University Athletic Association and football operational headquarters for a $65 million expansion of approximately
Mechanical and plumbing systems design and construction phase services for the renovation of a 18,850 sq. ft. old football locker
Mechanical and plumbing systems design and construction phase services for the renovation of a 1,000-bed student living facility.
Mechanical design and construction phase services for 1,150 linear feet of underground chilled water distribution system consisting of 14, 12,
Mechanical design and construction phase services for a new 55,700 sq. ft. academic science building. Program requirements include specialized science
HVAC, plumbing, and fire protection systems for a new $28-million, 104,000 sq. ft., 344-bed residence hall. The project has achieved
Mechanical design and construction phase services for a 78,000 sq. ft. life sciences building. Program requirements include specialized science and
New 75,000 sq. ft. building, which contains a state-of-the-art Performing Arts Center and the Morehouse Music Education Building. 700-seat auditorium
Mechanical design and construction phase services for a new 123,000 square-foot facility, which includes 36 labs, 12 classrooms, 2 seminar
Mechanical design and construction phase services for a new 61,500 sq ft fitness and wellness facility, which includes a natatorium,
Complete mechanical design for a $30-million, 110,000 sq. ft. Olympic sports training facility that is attached to the existing campus
Mechanical engineering design services for the demolition of the existing 159-bed residence hall and reconstruction of a new $21-million, 78,000
Mechanical design and construction phase services for the University Athletic Association and Football Operational Headquarters with a renovation of 56,000
Mechanical design and construction phase services for complete interior demolition and renovation of a 28,900 sq. ft. classroom building originally
Mechanical design and construction phase services for a new 50,000 sq. ft. three-story dining and classroom building. The building includes
Mechanical design and construction phase services for a 275,000 sq. ft. mixed-use complex comprised of a seven-story building, a six-story
Mechanical design and construction phase services for a new 16,000 sq. ft. four story classroom building addition plus an 8,500
Mechanical design and construction phase services for the University of Georgia Athletic Association’s new West End Improvement project that includes