Fifth Runway I-285
Bridge Structures
Scope
Provide mechanical and
fire suppression systems to protect 5th runway bridge structures
over Interstate Highway 285. |
|
|
Owner
Atlanta Hartsfield-Jackson Airport
General
Contractor
Archer Western Contractors
Prime Consultant
Womack & Associates
Construction Cost
$160,000,000 (total)
$2,000,000 (mechanical)
|
|
Special Circumstances
-
In addition to standard code requirements, the Clayton County Fire
Department (CCFD) also requested the following features:
- FireAde 2000 wetting
agent in lieu of AFFF.
- Ability to re-supply
the foam storage tanks while in use.
- Auxiliary foam supply
to battle smaller fires without utilizing the fire pump house.
-
Fire suppression system includes a 100hp Fire Pump, two 2,200-gallon
air compressor/dryers, two pre-action valve assemblies, two 2,000-gallon
foam storage tanks, two 600-gallon underground storage tanks, two foam
transfer pump assemblies, and two under-roadway vaults to house eductor
assemblies.
-
Ventilation System includes 12 75hp longitudinal jet fans integrated
with carbon monoxide sensing system to ventilate on build-up of CO
within the tunnels. Provisions for 12 future fans were incorporated for
build-out of access lanes.
-
Fans can be utilized for smoke evacuation of the tunnel via manual
activation locally by the fire department. Local fan control is
possible at various points on site for safety considerations.
-
Designed heating, air conditioning, and ventilation for four utilities
buildings housing electrical switchgear, UPS systems, and the computer
command center. Critical computer and electrical systems were provided
with 100 % redundant HVAC units.
|
|
|
|