New
Switching Facility
Scope
Design the
mechanical systems for a new two-story, 92,600 square foot telephone switching
facility. |
|
 |
Mechanical
Contractor
W.W. Gay
Prime Consultant
Howell Rusk Dodson
Construction Cost
$4,500,000 (mechanical) |
|
Special Circumstances
-
The HVAC system design
consists of four 400-ton centrifugal chillers (two future), two
10,000-gallon underground water storage tanks, and over seventy computer
room air conditioning units.
-
Two 20,000-gallon underground
fuel tanks supply four 2-megawatt emergency generators (two future),
which can power the entire facility.
-
The central chiller plant
design includes an “N + 1” redundancy requirement.
-
A zoned pre-action fire suppression system protects the facility.
|
|
|
|