Design the
mechanical systems for a new two-story, 92,600 square foot telephone switching
facility.
Mechanical
Contractor
W.W. Gay
Prime Consultant
Howell Rusk Dodson
Construction Cost
$4,500,000 (mechanical)
Special Circumstances
The HVAC system design
consists of four 400-ton centrifugal chillers (two future), two
10,000-gallon underground water storage tanks, and over seventy computer
room air conditioning units.
Two 20,000-gallon underground
fuel tanks supply four 2-megawatt emergency generators (two future),
which can power the entire facility.
The central chiller plant
design includes an “N + 1” redundancy requirement.
A zoned pre-action fire suppression system protects the facility.