Data Center Addition
Scope
Provide mechanical systems design for HVAC, plumbing, and fire protection systems to build-out 8,500 square feet of the existing data/telecom center.
Mechanical Contractor Signal Point Systems
Prime Consultant Barnett Consulting Engineers
Construction Cost $250,000 (mechanical)
Special Circumstances
New mechanical system for the build-out consisted of 220 tons of computer room units using a glycol heat rejection loop.
Glycol drycoolers were mounted on a rooftop service platform.
A new DDC system was added to monitor and control the entire facility.
All work installed while the center stayed in continuous operation.