Incinerator Upgrade

Scope

Preliminary investigation, contract drawings and specifications, construction period services, and site visits for replacement of incinerator with alternate hazardous waste disposal system.

hospital view

Owner
V.A. Medical Center

Mechanical Contractor
Cooper & Company

Prime Consultant
Johnson, Spellman & Associates

Construction Cost
$1,500,000

Special Circumstances

  • Civil, structural, architectural, electrical, and mechanical investigation of existing conditions.

  • Removal of existing medical and pathological waste incinerators.

  • Sampling of existing refractory and fly ash contamination.

  • Installation of packaged sterilizer/shredder/compactor unit connected to all utilities.

  • Replaced defective 76” boiler breaching.

  • Rush design and construction.