Building Renovation

Scope

Provide mechanical systems design and construction phase services for HVAC, plumbing, and fire protection systems for renovation of the existing 94,000 square foot school.

Owner
Atlanta Public Schools

Mechanical Contractor
CD Mechanical

Prime Consultant
KPS Group

Construction Cost
$6,500,000 (total)
$1,800,000 (mechanical)

Special Circumstances

  • New HVAC system including 55 energy efficient water-cooled heat pumps serving the individual classrooms, and 5 package units serving the common areas (cafeteria, multi-purpose rooms, etc.).

  • Tempered water loop dedicated to the heat pumps is cooled by a 220-ton cooling tower and heated by a 1,000 93% efficient MBH gas-fired boiler.

  • Outside air requirements are met by five energy recovery ventilators, each with a heat wheel for sensible and latent heat recovery.

  • Total OSA delivered was 31,000 CFM.

  • Entire existing domestic water system was removed to ensure no lead contamination of the drinking water.

  • Cooling tower drain lift station automatically pumps water to sewer system.

  • Cooling tower selected for low noise impact on neighboring residences.