Library, Boyd, and Pafford Buildings Mechanical Renovations
Scope
Removed three
existing 30+ year-old chillers and associated pumps and replaced
with two chillers with variable flow rate capability. Provided new
pumps with system configured for future variable chilled water flow
operation. Extensive change out of pneumatic controls and conversion
to Direct Digital Controls as extensions of existing campus DDC
system.
Owner University of West Georgia
Mechanical Contractor J.M. Clayton
Prime Consultant Johnson, Spellman &
Associates
Construction Cost
$940,000 (total)
$800,000 (mechanical)
Special Circumstances
Development of specific timeline and
dates for start and end of work, allowable shutdown dates and
timelines, and work restrictions in areas in-use per meetings
with representatives of campus facilities management, Library
system, and other academic departments.
Definition of building demolition
and rebuild necessary to accommodate rework of land-locked
Chilled Water System.
Design of customized air handling
unit as replacement for 35 year old air handling unit located in
wrap-around, metal Penthouse with limited physical height and
floor area provided in the Penthouse