Coliseum Training Facility
Scope
Complete
mechanical design for a 110,000 square foot Olympic sports training
facility that is attached to the existing campus sports arena. This
annex houses a world class gymnastics training area, separate Men’s
and Women’s basketball practice gyms, locker rooms and office areas
in addition to a 14,000 square foot strength training center. The
practice gyms are designed for multi-purpose functions, including
banquets, exhibitions and event staging. |
|
 |
Owner
University of Georgia
Athletic Association
Mechanical
Contractor
Martin Mechanical
Prime Consultant
Collins Cooper Carusi
Construction Cost
$30,000,000 (total)
$2,700,000 (mechanical) |
|
Special Circumstances
-
Provide cooling, heating and
outside air requirements for men's and women's basketball
practice gyms for a wide range of occupancy (from daily
basketball team usage to banquet hall).
-
Design of 14,000 sq. ft. weight
lifting area with specific cooling, ventilation and humidity
needs.
-
Design of new steam system to
utilize existing campus steam loop to serve Laundry facility
with steam clothes dryers and to convert steam to domestic
hot water and steam to hot water for space heating purposes.
-
Installation and design of new
30,000-gallon condenser water storage sump and associated
cooling towers and vertical turbine pumps.
-
Multiple temperature domestic
hot water systems to serve Laundry, Catering, and general
building hot water use. Mixing valves utilized to reduce
how water temperatures.
-
Dedicated variable speed 60,000
cfm exhaust system to serve enclosed Truck Court and Loading
Dock area for carbon monoxide and nitrogen dioxide removal.
|
|
|
|