|
|
|
home
ABOUT JSA
expertise
projects/
portfolio
career
opportunities
contact jsa |
 |
|
Reed
Plaza Expansion
On football game
days, Reed Plaza has become a spacious gathering place for football
fans. The Plaza adds new restroom stalls, concession areas and an
additional 30,000 square feet to the stadium's public space. During
the rest of the school year, fences keep people out of the stadium,
but most of the space has become a pedestrian concourse connecting
the main part of campus to the university's growing East Campus.
|
 |
Owner
University of Georgia
Athletic Association
Construction Cost
$9,800,000 (total)
$315,000 (mechanical) |
|
Special Circumstances
-
Removal of
approximately 3 feet of grade from the existing Sanford Stadium
100 Level between the Stadium and Reed Plaza. All utilities
below grade were relocated including water and power feeds.
-
Removal of
portion of Memorial Hall to allow larger Plaza area. Included
renovation of building rainwater drainage system and relocation
of existing HVAC condensing units.
-
Removal of
existing cooling tower serving Reed Hall. Addition of
approximately 850 feet of 8” chilled water supply and return
piping serving Reed Hall from the campus chilled water loop.
-
New 2,500 sq.
ft. Concession building with 24 points of sale. Concession
building includes safe waste system per Georgia amendments to
the International Plumbing Code and a 1,500-gallon grease
interceptor. Concession water heater supplies 140°F water to
wash sinks and 110°F water to hand wash sinks.
-
Two new 2,350
sq. ft. Restroom Buildings. Restroom Buildings include three
new Family Restrooms, 58 Women’s fixtures and 36 Men’s fixtures.
-
Restroom
plumbing fixtures include 1.28 gallon per flush (gpf) water
closets and 1/8 gpf (pint) urinals. All restroom plumbing
fixtures are low flow type and are hard-wired sensor operated to
aid in water conservation and sustainability.
|
|
|
|