home

ABOUT JSA

expertise

projects/
portfolio

career
opportunities

contact jsa

         

Reed Plaza Expansion

 

On football game days, Reed Plaza has become a spacious gathering place for football fans.  The Plaza adds new restroom stalls, concession areas and an additional 30,000 square feet to the stadium's public space.  During the rest of the school year, fences keep people out of the stadium, but most of the space has become a pedestrian concourse connecting the main part of campus to the university's growing East Campus.

 

Owner
University of Georgia
Athletic Association

Construction Cost
$9,800,000 (total)
$315,000 (mechanical)

 

 

Special Circumstances

  • Removal of approximately 3 feet of grade from the existing Sanford Stadium 100 Level between the Stadium and Reed Plaza.  All utilities below grade were relocated including water and power feeds.

  • Removal of portion of Memorial Hall to allow larger Plaza area.  Included renovation of building rainwater drainage system and relocation of existing HVAC condensing units.

  • Removal of existing cooling tower serving Reed Hall.  Addition of approximately 850 feet of 8” chilled water supply and return piping serving Reed Hall from the campus chilled water loop.

  • New 2,500 sq. ft. Concession building with 24 points of sale.  Concession building includes safe waste system per Georgia amendments to the International Plumbing Code and a 1,500-gallon grease interceptor.  Concession water heater supplies 140°F water to wash sinks and 110°F water to hand wash sinks.

  • Two new 2,350 sq. ft. Restroom Buildings.  Restroom Buildings include three new Family Restrooms, 58 Women’s fixtures and 36 Men’s fixtures.

  • Restroom plumbing fixtures include 1.28 gallon per flush (gpf) water closets and 1/8 gpf (pint) urinals.  All restroom plumbing fixtures are low flow type and are hard-wired sensor operated to aid in water conservation and sustainability. 

 

   Copyright © 2013 Johnson, Spellman & Associates, Inc.
  Privacy and Use Policy