Mechanical systems design and construction
phase services for 19,000 sq. ft, two-story building for computer workrooms
and servers for the faculty and student’s access.
Owner
University of Georgia
Mechanical
Contractor
Martin Mechanical
Prime Consultant
Lord, Aeck & Sargent
Construction Cost
$3,120,000
Special Circumstances
Building was elevated to avoid the
rework of a number of existing site utilities. The elevated
building also maintained one of the main walkways to the football
stadium.
60-ton, variable volume air handling
unit with frequency drive supplying terminal units with a constant 55°F
air temperature.
33 powered induction terminal units
with hot water reheat were used to maintain temperature settings.
The existing campus steam loop was
tapped and brought into the building. A steam-to-hot water
converter supplied hot water to the building. Steam condensate
pumps were sized to return condensate to the central steam plant across
campus.
Addition of a new fire pump for the
new Chemistry Annex and the existing adjacent Chemistry Building was
required for code compliance.
The existing campus chilled-water
loop was utilized to provide cooling to the building. Special care
was needed tapping the existing underground concrete/asbestos pipe.