Complete
mechanical design and construction phase services for the 170,000
sq. ft. renovation of five lower tenant floors and the three garage
sub-basement levels of this downtown high-rise building.
Owner
Georgia Building Authority
Mechanical
Contractor McKenneys
Prime Consultant Richard &
Wittschiebe Architects
Construction
Cost $12,400,000
(total)
$3,100,000 (mechanical)
Special Circumstances
New stairwell pressurization
systems.
Replace and update existing enclosed
garage ventilation systems.
Extend HVAC systems (from existing
equipment in penthouse) down to all five floors including VAV
duct system, hot water heating piping, and 24/7 auxiliary
cooling water.
Replace existing domestic water
booster pumps and all existing sanitary waste piping.
New restrooms and breakroom plumbing
on all newly renovated floors.
Replace existing fire pumps and
sprinkler the newly renovated floors and an additional dry pipe
sprinkler system for garage levels.
Design had to account for continued
building operation for top three floors during construction.