Designed a new 100,000 square foot facility with 50,000 square feet
of raised floor area. Work has included numerous modifications to
the mechanical systems for this critical data center facility over a
period of 17 years. |
|
 |
Mechanical Contractor
Batchelor & Kimball
Prime Consultant
Johnson, Spellman & Associates
Construction Cost
4,000,000 - $5,000,000 (est.)
over 17-year period (mechanical) |
|
Special Circumstances
-
Expansion of the chilled water plant
from 1,200 tons to 2,400 tons.
-
A building expansion that included
the addition of a new, independent, secondary chilled water-piping
system incorporated into the existing primary/secondary piping system.
-
Design and installation of five new
diesel generator plants for complete on site power operation.
-
Design of the fuel-oil storage and
delivery systems for the diesel-generator plant, which included two
10,000-gallon underground fuel-oil tanks with redundant daytank and
piping system features.
-
Renovation of the existing automatic
fire protection sprinkler system, which included the addition of two new
fire pumps and rezoning of the system for multiple hazard
classifications.
-
Design and installation of complete
direct digital control and monitoring system for the entire central
plant.
-
Addition of redundant secondary
chilled water pumps and associated piping for cooling of the mainframe
computers.
-
Installation of backup water supply
for fire service and cooling towers to include wells, lake water supply
and 125,000-gallon on-site storage tank.
|
|
|
|