New Facility

Scope

Complete mechanical design and construction phase services for a new 56,000 square foot natatorium and gymnasium building with separate exercise rooms and administrative area.  Project facility is a LEED Certified Gold Level building.

Owner
Metro Atlanta YMCA

Construction Cost
$12,400,000 (total)
$1,800,000 (mechanical)


Special Circumstances

  • High efficiency HVAC systems reduce energy consumption by 20%.

  •  Energy recovery ventilators lowered building heating and cooling utility costs.

  • Gray water from the showers used to flush toilets, lowering water costs.

  • Gray water from pool filter backwash captured and used for site irrigation, lowering water costs.

  • Low flow showerheads reduce water and water heating costs.

  • Building DDC system monitors natural gas and power usage for excessive energy consumption.