Emergency
Department Addition and Renovation
Scope
Provide mechanical systems design and
construction phase services for a 17,600 sq. ft. addition and a 10,500 sq. ft.
renovation of the emergency department. |
|
|
Owner
Rockdale Hospital
Mechanical
Contractor
Batchelor & Kimball
Prime Consultant
CDH Partners
Construction Cost
$6,700,000 (total)
$1,639,000
(mechanical) |
|
Special Circumstances
-
Two new custom chilled water
air handling units with variable frequency drive fan motor and airside
economizer cycle. Each air-handling unit has independent ducted primary
and secondary outside air intake connections to maintain required
ventilation requirements.
-
Developed the Building
Automation System sequence of operations for the emergency department.
-
Maintain occupancy of
Emergency Department during construction and renovation.
-
Decontamination showers with
underground decontamination waste holding tank.
-
Water and medical gases
routed within crawlspace to serve new addition.
-
Waste and rainwater systems
routed to include new building portions but avoid existing building to
allow occupancy of existing building.
-
Medical oxygen, air, and
vacuum systems with shut-off valve cabinets located outside of each
building area.
-
Relocated medical gas master
alarm panels.
-
Various styles of plumbing
fixtures including wall-hung and floor-mounted toilets, sensor-operated
fixtures within public restrooms, various sinks, and a handicapped
accessible scrub sink.
|
|
|
|