New Building
Scope
HVAC, plumbing, and fire protection systems design and construction phase services for new 83,000 sq. ft. two-story elementary school.
Owner Atlanta Public Schools
Mechanical Contractor Shumate Mechanical
Prime Consultant Collins Cooper Carusi Architects
Construction Cost $9,200,000 (total) $1,400,000 (mechanical)
Special Circumstances
School classrooms are conditioned by water source heat pump system complete with pumps, cooling tower, heat exchanger, and boiler.
Three energy recovery ventilators are utilized to reduce outside air load on the water source heat pump system.
Cafeteria and multipurpose room are conditioned by packaged rooftop units independent from the other HVAC systems.
New hot water heaters and circulating pumps are used to serve the entire school.
New domestic water line and pressure reducing station was installed for the school.
New sprinkler system was installed throughout the school.
Complete Direct Digital Controls system monitors and controls all mechanical systems from a remote site.