Design of additional extruder line to the
existing plant.
Owner PGI
Mechanical
Contractor Lawson Mechanical
Prime Consultant
Johnson, Spellman & Associates
Construction Cost
$3,600,000 (total)
$2,500,000 (mechanical)
Special Circumstances
Preliminary design package included
chilled water study.
Dedicated, stand-alone chilled water
system including water-cooled chillers, pumping system, cooling tower
and temperature control system interlocked with equipment control panel.
New cooling loops for new extruding
machines to be installed using cooling tower water
Custom heat exhaust hood and fan for
dye casting station and hot oil piping system including pumps from oil
heaters to equipment.
A/C for roof-mounted packaged air
handling unit, supply and return ductwork to fit building and overhead
bridge crane with capability to provide make-up air for exhaust hood.
Piping connections for compressed
air and vacuum from existing utilities to new equipment.
Steel grid system under new piping
in area where fork lifts operate to protect piping from damage.