$32-million renovation of a 200,000 sq. ft. high school building for
Atlanta Public Schools. The 1,100-student school received extensive
interior upgrades along with new energy efficient HVAC systems and
automated building controls. Classroom spaces included general
instruction, science labs, performing arts and computer technology
suites.
Owner
Atlanta Public Schools
Mechanical Contractor
Shumate
Prime Consultant
RJ Griffin
Construction Cost
$32,000,000 (total)
$5,000,000 (mechanical)
Special Circumstances
Multi-year
project executed during two summer breaks and partial school
year.
Phase 1 - Conversion of classroom HVAC systems and central plant to
water-source heat pumps (WSHPs) for improved comfort and energy
savings. Fresh air provided by rooftop dedicated outdoor air system
(DOAS) units with desiccant-type energy recovery wheels.
Phase 2 - Replacement of HVAC systems for cafeteria, locker rooms,
lecture hall and former planetarium.
Phase 3 – New systems for main entrance and lobby addition and
renovated media center and performance theater.
Fast-track summer construction
windows with general contractor under CM at-risk contract.