New Gymnasium
Scope
Provide
mechanical systems design and construction phase services for HVAC, plumbing,
and fire protection systems for new 13,000 sq. ft. gymnasium with a two-story
support building attached to the gym. Support building is roughly 17,500 sq.
ft. with additional exercise and meeting rooms, offices, locker rooms,
restrooms, and concessions. |
|
 |
Owner
Mt. Bethel United Methodist Church
Mechanical
Contractor
Heritage Mechanical
Prime
Consultant
Collins Cooper Carusi Architects
Construction
Cost
$4,500,000 (total)
$640,000 (mechanical) |
|
Special Circumstances
-
Basic building HVAC system is
based on a tempered water loop piped throughout the building, with
individual water source heat pumps for each space, boiler plate heat
exchanger, cooling tower, and pumps.
-
Large percentage of outside
air required by the 2000 IBC for gymnasiums.
-
High latent load in exercise
rooms.
-
Building systems designed
for partial building occupancy conditions where only concessions & two
restrooms are in occupied mode, and rest of building is unoccupied.
- The systems consist of
custom rooftop direct expansion air conditioning units with integral
energy recovery wheels and a hot-water heating system located in the
lower floor mechanical room.
|
|
|
|