|
|
|
home
ABOUT JSA
expertise
projects/
portfolio
career
opportunities
contact jsa |
 |
|
Christian
Education Building
Scope
Provide
mechanical systems design and construction phase services for HVAC, plumbing,
and fire protection systems for new, 4-story, 70,000 sq. ft. elementary
school. |
|
 |
Owner
Mt. Bethel United Methodist Church
Mechanical
Contractor
Ragan Enterprises
Prime
Consultant
Collins Cooper Carusi Architects
Construction
Cost
$6,900,000 (total)
$992,000 (mechanical) |
|
Special
Circumstances
-
Basic building HVAC system is
based on a tempered water loop piped throughout the building, with
individual water source heat pumps for each space, boiler plate heat
exchanger, cooling tower, and pumps.
-
Both water systems (tempered
and cooling tower) have two full-size pumps for full redundancy.
-
Enthalpy heat recovery units
(ERVs) used for ventilation air supply.
-
Complete direct digital
control system.
-
Basement designed for shell
originally, but built-out on fast track schedule by end of original
project.
|
|
|
|