home

ABOUT JSA

expertise

projects/
portfolio

career
opportunities

contact jsa

        

Christian Education Building

Scope

Provide mechanical systems design and construction phase services for HVAC, plumbing, and fire protection systems for new, 4-story, 70,000 sq. ft. elementary school.

new education building

Owner
Mt. Bethel United Methodist Church

Mechanical Contractor
Ragan Enterprises

Prime Consultant
Collins Cooper Carusi Architects

Construction Cost
$6,900,000 (total)
$992,000 (mechanical)

Special Circumstances

  • Basic building HVAC system is based on a tempered water loop piped throughout the building, with individual water source heat pumps for each space, boiler plate heat exchanger, cooling tower, and pumps.

  • Both water systems (tempered and cooling tower) have two full-size pumps for full redundancy.

  • Enthalpy heat recovery units (ERVs) used for ventilation air supply.

  • Complete direct digital control system.

  • Basement designed for shell originally, but built-out on fast track schedule by end of original project.

   Copyright © 2010 Johnson, Spellman & Associates, Inc.
  Privacy and Use Policy