Complete
mechanical systems design and construction phase services for HVAC,
plumbing, and fire protection systems to serve this new two-story
cancer treatment facility on the Roy Schneider Hospital campus. The
facility includes both radiation and chemotherapy treatment centers.
Owner Roy Schneider
Hospital
Mechanical
Contractor
Central Air
Prime Consultant
Stanley Beaman & Sears
Construction Cost
$10,500,000 (total)
Special Circumstances
All outdoor components and
equipment specified with optional materials for improved
life expectancy in coastal area.
Recording quality noise levels
at the Auditorium.
Custom-configured air handling
units including dedicated chilled water cooling coil at each
unit for dehumidification of outside air.
Dedicated air compressor and
air-cooled chiller and chilled water piping system for
medical diagnostic equipment.
Domestic water piping as
extension from existing cistern and domestic water pumping
system.
Pre-action fire protection
sprinkler system for specialized medical equipment areas.