Complete mechanical systems design and construction phase services
for HVAC, plumbing, and fire protection systems to serve a new a
26,000 sq. ft. early learning classroom building.
A tempered energy recovery unit
with enthalpy wheel was implemented to reduce outside air
load on the water source heat pumps. This unit utilizes a
direct expansion cooling coil and modulating hot gas reheat
to keep space humidity within design levels.
Two new domestic hot water
heaters piped in parallel with circulating pump and mixing
valve were used to serve the entire school.
Special considerations were
taken to provide plumbing fixtures that incorporated Owner
requests and provided child accessibility. Messy rooms were
provided with floor drains with integral solid interceptors
and hose bibs for wash down.
Complete Direct Digital Controls
system monitors and controls all mechanical systems from a
remote site.