Mechanical systems design and construction phase services for
installation of a 750-ton centrifugal chiller and two roof-mounted
cooling towers as part of a multi-phase Master Plan for the
build-out of a Chilled Water Central Plant to include four
centrifugal chillers.
Owner
Georgia State University
Contractor
Schadsons
PrimeConsultant
Johnson, Spellman & Associates
ConstructionCost
$1,143,000 (total)
$769,000 (mechanical)
Special Circumstances
Coordinate requirements on
drawings and in specifications, including Special
Conditions, for installation of equipment in an under-street
level mechanical room with limited access, means of
transporting equipment to the room and an undersized room
opening.
Limited space on the roof for
placement of new cooling towers to accommodate required
service clearances and clearances to roof perimeter.
Revisions to the Sequences of
Control and coordinated piping design to accommodate
simultaneous Waterside Economizer Operation and Normal
Chiller Operation with set of control valves at the cooling
towers to segregate condenser water flow through dual
condenser water piping systems.