Complete
replacement of the existing mechanical HVAC ventilation systems to
improve indoor air quality in the various art studios. Studios
included Ceramics, Photography, Textiles, Print Making, Foundry and
the Painting and Drawing Studio. Replacement of the existing supply
air distribution system was part of the project scope. All new work
was designed to meet current building codes.
Owner
Georgia State University
Contractor Hogan Construction Group
PrimeConsultant
Johnson, Spellman & Associates
ConstructionCost
$3,500,000 (total)
$2,500,000 (mechanical)
Special Circumstances
Replacement of the HVAC systems
for the Classroom/Studio and Office area of the building and
upgrading the exhaust systems during a prolonged summer time
building vacancy.
The exhaust systems were
upgraded to meet today's guidelines concerning ventilation
and air change rates for the Art and CeramicStudios.
Specialized hoods were designed
where required at locations such as the Printmaking and Photography film
developing sinks.