Provide mechanical systems design and
construction phase services for renovation of the existing laboratory. Complex
renovation required changing duct and pipe systems around existing occupancies
that were intended to remain.
Owner
Georgia State University
Mechanical Contractor E. Escher
Construction Cost
$799,000 (total)
$418,000 (mechanical)
Special Circumstances
Complete removal of existing HVAC
system. Two new constant volume, multi-zone air handling systems
provided.
Full renovation of the associated
chilled water and steam heating piping distribution systems including
coordination with impact on new chilled water and steam piping systems
serving the associated, seven-story building.
Clearances from floor-to-structure
above typically only 9’6” to 9’9”.
Fish Holding Room included a
requirement for a wide range of room temperature control capability from
mid-50° to mid-70°. Special filtration of water and make-up air
required.