home

ABOUT JSA

expertise

projects/
portfolio

career
opportunities

contact jsa

      

New Aquatic Center

Scope

Mechanical systems design and construction phase services for a new 28,000 sq ft aquatic center complete with an 11-lane competition pool, competition diving area, wet classroom, dressing rooms, coaches offices, and seating for 300 spectators.

Owner
Greater Atlanta Christian School

Mechanical Contractor
Ragan Enterprises

Prime Consultant
Collins Cooper Carusi

Construction Cost
$7,300,000

Special Circumstances

  • Dedicated air-handling system serving Competition Pool with unit construction and dehumidification capacity, room air purge mode, and energy recovery capabilities, all configured and specialized for pool environment application.

  • Fabric-type ductwork included at Competition Pool area to compliment architectural design and address demands of indoor pool application.

  • Pool water heater including specialized configuration for pool water service.

  • Energy recovery ventilator serving office and locker areas to reduce heating and cooling operating costs.

  • Carbon dioxide level sensing of occupied space utilized to minimize outside air load on the supplemental heating and cooling system serving the Competition Pool spectator area.

  • Energy efficient water heaters (94% thermal efficiency).

  • Water and energy conservation with timed, automatic shut-off of water flow at individual showers after push-button start by user.

   Copyright © 2010 Johnson, Spellman & Associates, Inc.
  Privacy and Use Policy