|
|
|
home
ABOUT JSA
expertise
projects/
portfolio
career
opportunities
contact jsa |
 |
|
New
Aquatic Center
Scope
Mechanical
systems design and construction phase services for a new 28,000 sq
ft aquatic center complete with an 11-lane competition pool,
competition diving area, wet classroom, dressing rooms, coaches
offices, and seating for 300 spectators. |
|
 |
Owner
Greater Atlanta Christian
School
Mechanical
Contractor
Ragan Enterprises
Prime
Consultant
Collins Cooper Carusi
Construction
Cost
$7,300,000 |
|
Special Circumstances
-
Dedicated air-handling system
serving Competition Pool with unit construction and
dehumidification capacity, room air purge mode, and energy
recovery capabilities, all configured and specialized for
pool environment application.
-
Fabric-type ductwork included at
Competition Pool area to compliment architectural design and
address demands of indoor pool application.
-
Pool water heater including
specialized configuration for pool water service.
-
Energy recovery ventilator
serving office and locker areas to reduce heating and
cooling operating costs.
-
Carbon dioxide level sensing of
occupied space utilized to minimize outside air load on the
supplemental heating and cooling system serving the
Competition Pool spectator area.
-
Energy efficient water heaters
(94% thermal efficiency).
-
Water and energy conservation
with timed, automatic shut-off of water flow at individual
showers after push-button start by user.
|
|
|
|