New Facility
Scope
Complete mechanical design and construction phase services
for a new 54,000 square foot natatorium and gymnasium building with separate
exercise rooms and administrative area. Project facility is a LEED
Silver
building and will be used as a model for future projects by this owner. |
|
|
Owner
Metro Atlanta YMCA
Construction Cost
$10,000,000 (total)
$1,500,000 (mechanical)
 |
|
Special Circumstances
-
Gray water from the showers and pool filter
backwash captured and recycled for use in the gray water system.
-
Gray water used to flush toilets, saving
390,000 gallons of potable water per year.
-
Gray water used for site irrigation, saving
125,000 gallons of potable water per year.
-
24 ultra-low flow showerheads reduce potable
water consumption and water heating costs.
-
Waterless urinals were installed, saving
150,000 gallons of potable water per year.
-
Total potable water consumption reduced by
37%; estimated savings of 880,000 gallons per year, compared to typical
plumbing design.
-
High efficiency HVAC systems reduce energy
consumption by 20%.
-
Energy recovery ventilators lowered building
heating and cooling utility costs.
-
Room carbon dioxide level sensing utilized
to minimize outside air load on the heating and cooling systems.
-
Energy efficient water heaters (90%+ AFUE)
reduce natural gas consumption.
-
Building DDC system monitors HVAC and
lighting system for excessive energy consumption.
|
|
|
|