Mechanical systems design
and construction phase services for the renovation of the 14,000 sq. ft.
Vivarium Laboratory.
Owner
Emory Clinic
Mechanical Contractor
Mann Mechanical
Prime Consultant
Stanley Beaman & Sears Architects
Construction Cost
$6,000,000 (total)
$1,660,000 (mechanical)
Special Circumstances
Two-phased renovation project coordinated to
accommodate staggered schedule in move-out from occupied area; included
design for interchange of occupied areas served by respective air units.
Two air-handling units of 100% outside air
including one air unit with a sensible-only, air-to-air heat pipe heat
exchanger with a vented, double-wall air gap between air streams as a
customized feature.
Bio-level 2 containment room.
Stainless steel, clean steam generator and
associated feedwater tank and pump unit.
All stainless steel piping for clean steam
and clean steam condensate piping systems.
Dedicated exhaust system for animal (mice)
holding racks and nine associated bio-safety cabinets.
A chemical fume hood with remote mounted
exhaust fan.
Extension of existing high-pressure steam piping system to serve new
equipment.