|
|
|
home
ABOUT JSA
expertise
projects/
portfolio
career
opportunities
contact jsa |
 |
|
Goizueta
Foundation Center
Scope
Complete
mechanical design and construction phase services for a new 90,000
square foot classroom and office building with a café and executive
dining room. Project facility has achieved a Gold rating under the LEED green building program. |
|
 |
Owner
Emory University
Construction Cost
$32,000,000 (total)
$3,700,000 (mechanical)
 |
|
Special Circumstances
-
Rainwater used for site irrigation, saving
312,000 gallons of domestic water per year.
-
Low flow plumbing fixtures used to conserve
593,000 gallons a year over 1992 EPACT requirements.
-
Building designed to comply with ASHRAE
62-2001 standard of acceptable indoor air quality.
-
Building energy performance optimized to
yield 25% savings over equivalent model building that meets the latest
Energy Code.
-
MERV 13 filtration media used in the air
handling units to improve indoor air quality.
-
Energy recovery ventilator utilized to lower
building heating and cooling utility costs.
-
Room carbon dioxide level sensing utilized
to minimize outside air load on the heating and cooling systems.
-
Building DDC system monitors HVAC and
lighting system for excessive energy consumption.
|
|
|
|