|
|
|
home
ABOUT JSA
expertise
projects/
portfolio
career
opportunities
contact jsa |
 |
|
Industrial
Laboratories
Scope
Mechanical design for 40,000 square foot,
2-story office building with a 36,000 square foot lab building. |
|
 |
Owner
Columbian Chemical Company
Mechanical
Contractor
Batchelor & Kimball
Prime
Consultant
Johnson, Spellman & Associates
Construction
Cost
$15,000,000 (total)
$5,000,000 (mechanical) |
|
Special Circumstances
-
Architecturally sensitive building
required careful coordination.
-
40,000 CFM air-conditioning system
serving the laboratory building.
-
71,000 CFM stainless steel general
fume exhaust system serving fume hoods and equipment. This system
includes final filtration stage and dual exhaust fans.
-
70,000 CFM conditioned and humidity
controlled make-up air system serving the laboratory building.
-
44,000 CFM, high velocity
particulate exhaust system including dust collection.
-
Custom, dual tunnel, 114,000 CFM
air-handling unit serving the air conditioning and make-up systems.
-
Three air-cooled chillers with total
capacity of 680 tons of cooling.
-
Tempered water system for process
cooling.
-
Four dedicated humidity control
air-handling units serving specific laboratories.
-
Complete DDC integrated control
system.
|
|
|
|