New Learning
Center
Scope
New
4-story 120,000 square foot combination classroom and administrative office
building. The HVAC design included air-to-air recovery units, a complete
Direct Digital Control System, and a 120,000 CFM smoke exhaust system serving
the four-story atrium space. Seven air-handling units were used to match the
occupancy zoning of building to maximize On/Off control of air-handling units
and energy efficiency. New 370-ton centrifugal chiller and two fully
condensing-type 2 MMBTUH boilers part of a stand-alone Central Plant serving
this building. |
|
 |
Owner
Board of Regents
Mechanical Contractor
MCI
Prime Consultant
Gardner Spencer Smith Tench
& Hensley PC
Construction Cost
$17,700,000 (total)
$2,700,000 (mechanical) |
|
Special Circumstances
-
Mechanical systems designed to accommodate
"open" style of circulation spaces in the building and maximized ceiling
heights in all classrooms with riser style seating
-
Dual-purpose air handling units designed to
meet the "normal mode" HVAC requirements of the Atrium and to meet the
100% make-up air / outside air requirements in the "smoke evacuation
mode". Exhaust air system capability of 120,000 CFM.
-
Siting of Chiller Room, Boiler Room and
Cooling Tower Enclosure to accommodate acoustic and aesthetic concerns
for new building and surrounding, existing campus environment.
-
Total energy recovery-type air-to-air heat
exchangers.
-
Room occupancy-type sensors used to reduce
outside air intake by air handling units when classrooms unoccupied.
Automated, variable volume outside air intake control.
|
|
|
|