New Parasitic
Diseases Laboratory
Scope
Design the mechanical
systems (HVAC, fire protection, and fuel storage) for a new 27,384 sq. ft.
laboratory and support space. |
|
 |
Owner
Centers for Disease Control
Mechanical Contractor
Meridian Contracting
Prime Consultant
Tippett Clepper & Associates
Construction Cost
$6,200,000 (total)
$1.650,000 (mechanical) |
|
Special Circumstances
-
Phasing of the project into two separate
construction periods to accommodate existing personnel.
-
Two custom 20,000 CFM, variable volume air
handling units.
-
An above ceiling service corridor required
all equipment requiring service (i.e., air valves, HVAC and plumbing
control valves, etc.) to be within reach of the corridor.
-
Steam-to-hot water heat exchanger utilizing
campus steam.
-
120-gallon steam water heater utilizing
campus steam.
-
Acid resistant waste and vent system.
-
A 12,000-gallon underground storage tank
provides fuel to a 250kW stand-by generator.
-
Integration of the building automation system with HVAC equipment, owner
equipment, and the building lighting.
|
|
|
|