Complete mechanical design and construction phase services for a
17,500 sq. ft. Special Needs classroom addition and HVAC renovations
for a 85,000 sq. ft. portion of the existing high school. New
energy recovery ventilators were added to provide energy efficient
pre-treatment of the outside air supplied to the classrooms. The
existing domestic water heating system and water coolers were
replaced.
New classroom addition included
a variable volume chilled water airhandler.
New classroom addition included
an energy recovery ventilator with heating and cooling coils
ducted to each classroom.
Five existing airhandlers were
replaced with energy efficient variable volume airhandlers.
The existing Locker Rooms were
conditioned by a new energy recovery ventilator with cooling
and heating coils. Similar units were added to the five
replacement airhandlers to pre-treat outside air required
for the classrooms.
Kitchen range hood ventilation
system was replaced.
The existing domestic water
heating system was replaced with a 94% efficient water
heating system.
Existing water coolers were
replaced with ADA compliant water coolers.