Building
Conversion
Scope
The work
involved mechanical engineering for cooling, dust, and fume control of
approximately 100,000 square foot high volume printing facility. |
|
 |
Mechanical
Contractor
Batchelor & Kimball
Prime Consultant
Johnson, Spellman &
Associates
Construction Cost
$1,200,000 (total)
$1,000,000 (mechanical) |
|
Special Circumstances
-
Dedicated
redundant air-conditioning system including two packaged air-handling
units, 35 tons cooling capacity each.
-
Two dust
collection systems, 100% air recirculation type for printing and
enclosures areas.
-
Central
vacuum system to cover 35,000 square feet of production space using.
-
Mechanical ventilation for mechanical room, which included the air
compressors farm and vacuum system, pump and dust collector.
-
DDC
control system compatible with building management control system.
-
Computer
room dedicated air conditioning system interlocked with existing roof
top unit, to provide system redundancy.
-
The room was also equipped with double interlocked preaction sprinkler
system.
|
|
|
|