Provide
mechanical systems design and construction services for a new 100,000 sq. ft.
central telephone switching facility. Building is designed for future growth
to a total of 200,000 sq. ft.
Mechanical
Contractor
Mechanical Contractors, Inc.
Prime Consultant
Alsbrooks Architects
Construction Cost
$28,000,000 (total)
$5,000,000 (mechanical)
Special Circumstances
Design plans for future high-rise status for HVAC, Plumbing, and Fire
Protection.
The
chiller plant design is based on this Owner's “N + 1” requirement
incorporating 100% redundancy into the central plant.
The
entire building can be powered by emergency generators, which are
supplied by three 20,000-gallon underground fuel tanks.
Energy efficient chillers and waterside economized piped in a “ side
car” arrangement lower utility costs.