New
Building
Scope
Mechanical
systems design and construction phase services for a new 2½‑story, 100,000 sq.
ft. central telephone switching facility. Building is designed for future
growth to a total of 200,000 square feet. |
|
|
 |
Mechanical
Contractor
W.B. Wallis
Prime Consultant
Howell Rusk Dodson/
Guerra Stoll Barker
Construction Cost
$30,000,000 (total)
$5,000,000 (mechanical) |
|
|
Special Circumstances
-
Design plans for future high-rise status for HVAC, Plumbing, and Fire
Protection.
-
All air
handlers serving critical areas feature redundant supply
fans and cooling coils.
-
The
chilled water system design is based on Owner's “N + 1” requirement incorporating 100%
redundancy into the central plant.
-
Two
10,000-gallon underground storage tanks provide emergency condenser
water make-up to the cooling towers.
-
The entire building can be powered by emergency generators that are
supplied by two 25,000-gallon underground fuel tanks.
|
|